Mount Way

At 1 Mount Way, the project began as a feasibility study exploring the potential of retaining the existing property while adding two new-build homes to the rear of the site. Positioned to take full advantage of the stunning sea views, the scheme focuses on maximizing land value and creating modern coastal residences within a prime location.

ACR-001-24-05-Current-Revision-Proposed-Scheme-for-2No-4-Bed-Dwellings-2048x1446
Project Details
Project Cost

£250K–£300K

Project Category

Fesability

Location

Mount Way

Service We Provide

This early-stage initiative involved evaluating various layout possibilities, considering planning constraints, and identifying the most viable path forward for a substantial home transformation.

  • Conducting initial feasibility analysis

  • Exploration of design and planning options in alignment with local policies

  • Provision of draft layout proposals and strategic recommendations

  • Identification of constraints, opportunities, and potential planning challenges

Mount Way

At 1 Mount Way, the project began as a feasibility study exploring the potential of retaining the existing property while adding two new-build homes to the rear of the site. Positioned to take full advantage of the stunning sea views, the scheme focuses on maximizing land value and creating modern coastal residences within a prime location.

Overview of Project

If you need further details or have specific aspects you’d like to highlight, feel free to provide additional information!

Project Needs

(Hover for more details)

Project Needs

£250K–£300K — set as a provisional estimate to guide design proposals and help weigh investment options based on the feasibility outcomes.

Project Timeline

(Hover for more details)

Project Timeline

The feasibility phase was delivered efficiently within a 4–6 week timeframe, providing the client with timely insights to inform the next steps in their investment or development journey.

Mount Way

Key Achievements

This feasibility project provided the client with a clear strategic framework to make informed decisions about moving forward. By identifying the most viable routes early, we laid the groundwork for a successful future development while mitigating potential risks.
Conducting initial feasibility analysis

  • Exploration of design and planning options in alignment with local policies
  • Provision of draft layout proposals and strategic recommendations
  • Identification of constraints, opportunities, and potential planning challenges
ACR-001-24-05-Current-Revision-Proposed-Scheme-for-2No-4-Bed-Dwellings-2048x1446

Mount Way: Drawings Images