Mill Lane

This project focused on delivering a contemporary new build home on a constrained and technically demanding plot.

ACR-52-23-01-Current-Revision-New-Builds-2048x1446 (1)
Project Details
Project Cost

£400K–£500K

Project Category

Fesability

Location

Mill Lane

Service We Provide

With planning permission already secured, our role involved translating the approved concept into a precisely detailed, building control-compliant construction package.

  • Preparation of building control drawings and construction-ready documents

  • Inclusion of detailed specification notes to guide contractor execution

  • Close coordination with structural engineers and environmental consultants

  • Responsive design amendments to address site limitations and maximise buildability

Mill Lane

This project focused on delivering a contemporary new build home on a constrained and technically demanding plot.

Overview of Project

If you need further details or have specific aspects you’d like to highlight, feel free to provide additional information!

Project Needs

(Hover for more details)

Project Needs

Working within a £400K–£500K budget range, the project required careful cost management and resource allocation to meet high-quality standards and site-specific structural requirements.

Project Timeline

(Hover for more details)

Project Timeline

Despite the challenges posed by the plot, the project progressed within the targeted 10–12 week timeframe, from technical detailing to coordination with consultants and contractors, allowing the client to move confidently toward the build phase.

Mill Lane

Key Achievements

The client aspired to create a modern and efficient home that maximized both the aesthetic appeal and spatial potential of a restricted site. The design was to embrace clean lines, natural light, and an open-plan feel, while tackling the site’s inherent complexities.

Mill Lane exemplifies our ability to bring modern architecture to life on challenging terrain. Through thoughtful detailing and coordinated execution, we ensured the client’s vision translated into a bold, buildable design.

ACR-52-23-01-Current-Revision-New-Builds-2048x1446 (1)

Mill Lane: Drawings Images