


34 Homefield Rd
A rear ground floor extension combined with internal reconfiguration to improve flow and bring more natural light into a family home.
View the projectWe check your permitted development rights, design within the limits and apply for a Lawful Development Certificate or prior approval where you need certainty.
Get your free permitted development check
Tell us about your project. We will come back to you within 24 hours.
What we cover
We check the limits that apply to your home, design within them and give you clear evidence that the work is lawful.
01 / 08
01Planning history, Article 4 directions and conditions checked before design.
02House, plot and earlier extensions measured against the original house.
Explore measured survey
03Depth, height and eaves tested against the relevant limits.
Explore single storey rear extensions
04Dormers and roof alterations designed within volume and height limits.
Explore loft conversions
05Drawings and application showing clearly how each limit is met.
06For a larger single storey rear extension where the route is available.
07Most permitted development work still needs Building Regulations approval.
Explore Building Regulations drawingsSend us the address and what you have in mind. We will check your rights in a free consultation.
Oldfield Crescent, extension drawingsWhy ArchEvolve
Permitted development rules are detailed, and one measurement over a limit means full planning permission is needed. ArchEvolve is MCIAT-chartered, checks your property's history and designations first, and designs within the limits so you have clear evidence the work is lawful.
You see the permitted development design in Enscape before committing, so you know how the extension or loft will look within the limits.
Drawings for certificates and prior approval show the measurements officers need to confirm each limit, which reduces queries and requests for information.
ArchEvolve checks permitted development rights for homes across West Sussex, East Sussex and Surrey, including properties in conservation areas.
Alex Page handles your project personally from the rights check to building regulations drawings, with no handoffs and no junior staff.
Permitted development
Most permitted development problems come from a limit nobody checked. We check them all before design starts.
Our permitted development services confirm whether your extension, loft conversion or outbuilding can go ahead without a full planning application. Permitted development rights are a national grant of planning permission in England, but they come with strict limits on size, height, position and materials, and some properties have them reduced or removed. We check those limits, design within them and, where you want certainty, apply for a Lawful Development Certificate.
Our work
Extensions and conversions we have designed for homeowners, with the scope and build cost of each.



A rear ground floor extension combined with internal reconfiguration to improve flow and bring more natural light into a family home.
View the project
A joint application between two owners, converting the loft spaces of each property into independent homes.
View the project
The transformation and expansion of an existing home on Marine Drive into a more spacious coastal home.
View the project
Expansion of an existing family home to improve internal flow and add essential living space.
View the projectHow it works
Our permitted development process moves from a rights check to a lawful, buildable design in seven steps.
The initial consultation is free, with no obligation.
We discuss what you want to build and take the address, so we can begin checking the rights that apply to your home. Free, no obligation.
We review the planning history, Article 4 directions, conservation area or listed status and any conditions that removed permitted development rights.
We measure the house and plot, including boundaries and earlier extensions, because the limits are tested against the original house and its curtilage.
We model the extension or loft in 3D and test height, depth, eaves and materials against the relevant permitted development class.
We confirm whether the work can proceed as permitted development, needs prior approval, or is better suited to a full planning application.
We prepare drawings and the application for a Lawful Development Certificate or prior approval, showing clearly how each limit is met.
Once confirmed, the same 3D model is developed into building regulations drawings, which most permitted development work still needs.
FAQ
Certificates, prior approval, conservation areas and Article 4 directions, answered plainly.
Question not covered here? Talk it through with us.
Call 01798 879894We check the planning history and designations of your property, measure it, design within the relevant limits and prepare a Lawful Development Certificate or prior approval application where needed. If permitted development does not apply, we move to a full application.
It is not compulsory, but a certificate is formal confirmation from the council that the work is lawful. It is useful when selling or remortgaging, or if a neighbour later questions the work, and it removes doubt before you spend money building.
In England, some houses can build a deeper single-storey rear extension than the standard limit by applying for prior approval. The council notifies adjoining neighbours and considers the impact on their amenity before deciding. The route is not available in conservation areas and other designated land.
They apply in a reduced form. Side extensions, cladding and roof extensions are restricted, and a council may remove further rights with an Article 4 direction.
An Article 4 direction is made by a council to remove specific permitted development rights in a defined area, often to protect local character. Where one applies, the work it covers needs a planning application. We check for directions before designing anything.
Flats and maisonettes do not have the householder permitted development rights that houses have, so most extensions and external alterations need planning permission. Developers may use other routes, such as prior approval for an office to residential conversion.
Usually, yes. Permitted development only deals with planning. Structural work, insulation, fire safety and drainage still need Building Regulations approval. Our guide explains building regulations vs planning permission.
Yes. Limits are measured against the original house, generally as it was first built or as it stood on 1 July 1948, so earlier extensions count towards the allowance. A condition on an earlier approval may also have removed rights.
Related services
If permitted development does not apply, or you want to go further, these are the services that come next.
01If you need full planning

A full application prepared and managed through to decision.
Learn more
Council-ready plans and elevations from one 3D model.
Learn more
Test a larger or sensitive scheme with the council first.
Learn more
Compare options before committing to a design.
Learn more02Projects that often start here

Wider living space across the back of the house.
Learn more
Kitchen, dining and family space opened up to the garden.
Learn moreAn extra room without adding to the footprint.
Learn more
Glazed walls and roof lights that bring in daylight.
Learn moreAreas we cover
We check permitted development rights for homeowners across West Sussex, East Sussex and Surrey from our studio in Storrington, and for property developers across England, working remotely over Microsoft Teams.
Our Storrington studioRings at 10, 20 and 30 miles
01West Sussex11 towns
02East Sussex2 towns